2011

Science and production Association “Consortium UkrGidroEnergoBud” / Science and production Association “Consortium UkrGidroEnergoBud”/ Complex of commissioning services, supply of equipment and installation works in compliance with the agreed Program for participation of STC ENPASELECTRO Ltd. in  completion of construction of  the second start-up complex of the Dniester PSPP composed of two hydropower units "

2011

"Energopartner Engineering" Ltd. / Complex of commissioning works for implementation of automated process control system (SCADA) on  330/110/10 kV  SS "Severna", supply of technological equipment in accordance with the basic design  " 330/110/10 kV substation "Severna". Expansion and reconstruction "

2011

"Emerson" LLC / Supply and installation of the relay protection system and cabling, commissioning and installation services for implementation of the unit and station level control and relay protection systems to be supplied for HPPs of PJSC “Ukrhydroenergo”.

2011

PJSC "Ukrhydroenergo" / Adjustment and commissioning works for resumption of working capacity of the CCC engineering station  and operator station CVS1, modification to the CENTRALOG system’ database of Kakhovskaya HPP.

2010

OJSC "Kamchatka gas-energy complex" / Installation and pre-commissioning of two hydroelectric units and electrical equipment of HPP-2 on river Tolmacheva in Kamchatka Territory.


Enlarge

 


Enlarge

 


Enlarge

 

2008-2010

OJSC "Ukrhydroenergo" / Design, arrangement, production of cabinets of control system and electrical protection system, vibration diagnostics and monitoring system, and mimic board of the setup and commissioning complex at the Dnestrovskaya Hydro Pump-storage Power Plant, performance of installation, commissioning and start-up works.


Enlarge


Enlarge


Enlarge

2009-2010

OJSC "Ukrhydroenergo" / Design, arrangement, production of cabinets of integrated control system and electrical protection system, diagnostics and vibration control systems, installation, performance of commissioning and start-up of control system of Block No. 2 of Kievskaya HPP

 


Enlarge

 


Enlarge

 


Enlarge

2008-2009

OJSC "Ukrhydroenergo" / Design, arrangement, production of cabinets of integrated control system and electrical protection system, diagnostics and vibration control systems, installation, performance of commissioning and start-up of control system of Blocks No. 5 & 6 of Kakhovskaya HPP


Enlarge


Enlarge


Enlarge

2007

Dneprovskaya Electric Power System NPC "Ukrenergo" / Implementation of PACIS substation control system at SS 330 kV "Rudnaya"


Enlarge


Enlarge


Enlarge

2007

OJSC "Zaporozhstal" / Performance of commissioning and putting into operation of the turbine generator electrical protection


Enlarge


Enlarge


Enlarge

2007

Poultry factory "Kurochka Ryaba"/ Design and commissioning of relay protection system at Substation 35 kV "Mironovskaya"


Enlarge


Enlarge


Enlarge

2006

OJSC "Ukrhydroenergo" / Installation of the mimic board at the main control board at  Dneprodzerzhinskaya HPP


Enlarge


Enlarge


Enlarge

2005-2007

OJSC "Yuzhenergostroy" / Performance of setup and commissioning works during putting into operation of control and protection systems of the first setup and commissioning complex at Tashlykskaya Hydro Pump-Storage Plant (units No. 1 and No. 2)


Enlarge


Enlarge


Enlarge

2005

OJSC "Ukrhydroenergo" / Transferring of CENTRALOG workstation and software of the plant control level at Kakhovskaya HPP


Enlarge


Enlarge


Enlarge

2004-2005

OJSC "Ukrhydroenergo" / Design, arrangement, production of cabinets of control and electrical protection systems of units No. 1 and 2 at Dneprodzerzhinskaya HPP, installation and commissioning


Enlarge


Enlarge


Enlarge

2004-2005

National Power Company "Ukrenergo" / Organization of data exchange between HPP plant-level control systems and operative-information complex of NPC "Ukrenergo"

2004

ALSTOM POWER Hydraulique /  Technical support during testing and putting into operation of unit-level controllers and plant-level control system at HPP FIERZA and VAU I DEJES in the framework of HPPs rehabilitation on river Drin in Albania


Enlarge


Enlarge


Enlarge

2002-2003

State Joint-Stock Hydro Generating Company “Dneprhydroenergo" / Design, production, supply, installation and setup of hydro unit control system simulator

2001

State Joint-Stock Hydro Generating Company “Dneprhydroenergo" / Training of operating personnel of hydro-power plants on the aspects of operation and maintenance of control, electrical protection and diagnostics systems of HPP equipment

1999-2003

ALSTOM POWER Hydraulique/ Maintenance of soft- and hardware, after-sales servicing and rehabilitation of equipment and devices made by ALSTOM POWER Hydraulique, as per Customer's request, at HPPs of the Dnepr Cascade

1999-2003

ALSTOM POWER Hydraulique / Testing and commissioning during putting into operation of unit- and plant-level control systems, relay protection system, switchyard controllers and plant controllers, thermodiagnostics and vibration monitoring systems at the Cascade of Kievskaya HPP and Kievskaya HPSPP, Kremenchugskaya HPP, Dneprovskaya HPP and Dneprovskaya HPP-2, Dneprodzerzhinskaya HPP, Kakhovskaya HPP and dispatcher's board of hydro-power cascade


Enlarge


Enlarge


Enlarge

1999-2001

State Joint-Stock Hydro-Generating Company "Dnestrhydroenergo" / Putting into operation of unit-level control system, electrical protection system, switchyard controllers and plant controllers, diagnostics system, CENTRALOG plant-level control system at Dnestrovskaya HPP